Green Energy Corridor In English

Facebook
WhatsApp
Telegram

 

Green Energy Corridor In English

||Green Energy Corridor In English||Green Energy Corridor India||

Green Energy Corridor In English


Green Energy Corridor (GEC) projects have been undertaken to facilitate renewable energy and reorient the grid for future requirements. The first component of the scheme inter-state GEC with a target capacity of 3200 circuit kilometers of transmission lines and sub-stations with a capacity of 17,000 MW was completed in March 2020. The second component—the interstate GEC with a target capacity of 9,700 km of transmission lines and sub-stations with a capacity of 22,600 MW, is expected to be completed by May 2021. At present, all efforts are focused on strengthening institutions, resources and protocols and investing judiciously in grid infrastructure. A total of 7175 km of transmission lines have been constructed and sub-stations with a total capacity of 7825 MW have been charged.





                                    Join Our Telegram Group

1000 HP GK MCQ QUESTION
Sorry this site disable right click
Sorry this site disable selection
Sorry this site is not allow cut.
Sorry this site is not allow copy.
Sorry this site is not allow paste.
Sorry this site is not allow to inspect element.
Sorry this site is not allow to view source.
error: Content is protected !!